AdON was presented with the opportunity to automate an ESD System whilst keeping the manual activation option available. In order to comply with the NFPA code, the ESD system had to be directly tied into the existing Fire and Gas Control System an set off if a fire or a gas leak was confirmed. AdON Engineers designed, fabricated, installed and commissioned the panel offshore conforming to all necessary industry standards and best practices.